Phase 0 — Unit economics

Model a single pilot site

Stress-test assumptions for one residential GPU cluster. Pick a market for napkin energy averages, or set Custom. Illustrative only — not a live offer or investment advice.

Upfront capex

€239,000

GPUs + infra + €70,000 house equity (25%)

Year 1 net cash

€58,952

5yr NPV @ 12%

-€15,028

Cash payback

4y 1m

Avg IT load

3.4 kW

4.6 kW facility

Cumulative cash flow (5 years)

Year 1 economics

Monthly net cash — year 1

Equations behind the charts

Napkin numbers only — rough working assumptions for a Phase 0 model, not audited figures or a quote.

Upfront capex
Capex = (GPUs × €/GPU) + infra + (property × down payment %)
Compute revenue / month
Compute = GPUs × 730 h × utilisation × €/GPU-hour
Rent revenue / month
Rent = monthly rent × occupancy
Electricity cost / month
Power = IT_kW × PUE × 730 × [(1 − solar%) × €_grid + solar% × €_solar]
Heat bill offset / month (heating months only)
Heat = IT_kW × 730 × capture% × €/kWh_heat (else 0)
Net cash / month
Net = Compute + Rent − Power + Heat − fixed opex − mortgage
Cumulative cash (chart)
Cumulative_m = −Capex + Σ Net_t for t = 1…m
5-year NPV @ 12%
NPV = −Capex + Σ [ Net_m / (1 + r_month)^m ]

What the terms mean

  • IT_kW — average power drawn by the GPUs themselves (after utilisation and idle floor). Not the whole house.
  • PUE — Power Usage Effectiveness. Multiplier for cooling, pumps, fans and house overhead. Facility kW = IT_kW × PUE (e.g. 1.35 ≈ 35% overhead).
  • Facility load — what the grid/solar must supply: IT_kW × PUE. Used for the electricity cost line.
  • Heat offset — money saved on heating when waste heat is captured in heating season. Not a third revenue line.
  • Utilisation — fraction of GPU-hours sold. Drives both compute revenue and (partly) power draw.
  • Upfront capex — cash out at day 0: GPUs + infra + property down payment (not the full mortgage).
  • NPV — present value of monthly net cash over 5 years, discounted at 12%/yr, minus upfront capex.

Napkin numbers: illustrative only. Heat offset applies in heating months for the selected market. Does not model GPU refresh, vacancy shocks, or utilisation decay. France is the pilot; DE/UK are roadmap signals.